Second Narrows Bridge with Three Cranes, Course of Construction, Proof

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span protruding from concrete reinforcement over existing bridge ramp; three cranes on top of bridge deck; crane closest to end of deck labelled "DOMINION BRIDGE"; labelled "PROOF" in bottom right corner.

This photograph is associated with Dominion Bridge Co. Ltd., contract # S.3703E.

No. 21 - Second Narrows Bridge, course of construction

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span protruding from concrete reinforcement over existing bridge ramp; two cranes on deck of incomplete span; metal girder suspended from crane furthest in; power line in far left of image.

Title box in lower right corner reads: "SECOND NARROWS BRIDGE VANCOUVER B.C.", "CONTRACT No S. 3703 E DOMINION BRIDGE CO. LTD.", "No 21", "DATE May 11, 1959".

Close up of south abutment, Second Narrows Bridge, course of construction, Vancouver, British Columbia

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span protruding from concrete reinforcement over embankment, resting on two sets of crossbar metal pillars, one set wider than the other; drainage tunnel behind narrower pillars; two cranes on top of bridge deck.

Title box in lower right corner reads: "SECOND NARROWS BRIDGE VANCOUVER B.C.", "CONTRACT No S. 3703 E DOMINION BRIDGE CO. LTD.", "No 20", "DATE APRIL 10, 1959".

No. 19 - Second Narrows Bridge, course of construction

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete metal bridge span protruding from concrete reinforcement, supported by two sets of cross bar metal pillars, one set wider than the other; two cranes on top of span; existing bridge ramp on timber and metal frame in foreground; bottom of photograph labeled "No 19", "APRIL 10, 1959."

This photograph is associated with Dominion Bridge Co. Ltd., contract # S.3703E.

No. 35 - Second Narrows Bridge with Concrete Piers, course of construction

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span stretching across water, supported by five visible concrete piers; two cranes on top of bridge deck; wood wharf in water to left of bridge; small barges and vessels around piers of bridge; North Shore mountains in background.

Title box in lower right corner reads: "SECOND NARROWS BRIDGE VANCOUVER B.C.", "CONTRACT No S. 3703 E DOMINION BRIDGE CO. LTD.", "No 35", "DATE NOV. 25, 1959".

Second Narrows Bridge with Concrete Piers, course of construction, proof

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span stretching across water, supported by five visible concrete piers; metal girder suspended vertically from crane at end of bridge span; wood wharf in water to left of bridge; small barges and vessels around piers of bridge; North Shore mountains in background; labeled "PROOF" in bottom right corner.

This photograph is associated with Dominion Bridge Co. Ltd., contract # S.3703E.

Second Narrows Bridge with Piers, course of construction, proof

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span stretching across water, supported by one concrete pier and one temporary pier; second concrete pier under construction; crane at end of span lowering metal panel on to second pier; mountains in background; labelled "PROOF" in bottom right corner.

This photograph is associated with Dominion Bridge Co. Ltd., contract # S.3703E.

Second Narrows Bridge with Concrete Reinforcement, course of construction, proof

Photograph depicts the course of construction on the Second Narrows Bridge (now the Iron Workers' Memorial Second Narrows Bridge).

Incomplete bridge span protruding from concrete reinforcement, stretching over railway tracks; supported by concrete pier; building built on stilts on pier beside bridge; labelled "PROOF" in bottom right corner of image.

This photograph is associated with Dominion Bridge Co. Ltd., contract # S.3703E.

Second Narrows Bridge with Barges, course of construction, proof

Photograph depicts what is likely the clean up of debris after the collapse of the Second Narrows Bridge (now the Ironworkers Memorial Second Narrows Crossing).

Two barges in water, loaded with metal girders and bridge components; cranes on both barges, as well as on end of bridge span in right of image; metal grated ramp in foreground of image; labeled "PROOF" in bottom right corner.

This photograph is associated with Dominion Bridge Co. Ltd., contract # S.3942E.

Failed pier and submerged north span, for Royal Commission, Second Narrows Bridge, Vancouver, British Columbia

Photograph depicts debris after the collapse of the Second Narrows Bridge (now the Ironworkers Memorial Second Narrows Crossing).

Bridge frame, attached to temporary pier frame, partially submerged in water; barge with crane and left leaning concrete pier to right of framework; docks in background.

Title box in lower right corner reads: "SECOND NARROWS BRIDGE VANCOUVER B.C.", "CONTRACT No S. 3942 E DOMINION BRIDGE CO. LTD.", "No 5", "DATE NOV. 10, 1958".

Resultados 1071 a 1080 de 1108